NAVOIY STATE UNIVERSITY
ENERGY MONITORING AND REVIEW REPORT
Photovoltaic Generation, Electricity Allocation and Energy Optimisation
Reporting period: July 2025 – October 2026
October 2026
Document Control
Field | Information |
Institution | Navoi State University |
Document | Energy Monitoring and Review Report |
Evidence | University monthly electricity statement; selected solar plant monitoring records |
Reference period | July 2025 – October 2026 |
Document approach | Structured technical review, informed by the USEK energy-audit sample |
Executive Summary
Navoi State University has an established photovoltaic electricity generation system and a digital monitoring environment supporting plant-level and portfolio-level review. This report brings together selected monitoring records and the university’s January–September 2026 electricity statement, which distinguishes electricity generated, used for university needs, sold to the Navoiy regional electricity enterprise, and electricity from solar thermal installations.
The university statement reports 694,742.72 kWh of photovoltaic electricity generated during January–September 2026; 313,241 kWh used for university needs; and 381,502 kWh sold to the regional electricity enterprise. These are the totals printed in the original statement, reproduced as source-reported figures. The statement contains no monthly entries for October–December and no numerical entries in the solar-thermal column.
Selected plant dashboards show cumulative generation ranging from 260.55 MWh to 358.00 MWh in October 2026. The Foreign Languages Faculty plant’s cumulative value increased from 198.64 MWh in July 2025 to 285.28 MWh in October 2026, a change of 86.64 MWh. These records provide a useful foundation for recurring generation reviews and for directing further examination toward high-demand buildings and equipment.
Contents
Introduction and review scope
2. Campus energy systems and monitoring infrastructure
3. Electricity generation and allocation analysis
4. Comparative plant performance
5. Energy review methodology and optimisation priorities
6. Recommendations and implementation framework
7. Conclusions
Appendix A. Source-data register
Appendix B. English translation of Uzbek electricity statement
Appendix C. Monitoring platform technical reference
1. Introduction and Review Scope
The purpose of an institutional energy review is to understand energy supply, generation, consumption and operational patterns, enabling evidence-based identification of potential inefficiencies. This report examines the available photovoltaic records and the university’s electricity-allocation statement, and sets out a repeatable process for reviewing energy use at facility level.
1.1 Review procedure
The assessment classifies records by plant, portfolio and university-wide reporting scope; reviews generation and allocation trends; compares cumulative generation across selected installations; and proposes consumption-focused review activities. The structure follows the technical-audit convention of describing evidence, analytical findings, prioritised measures and supporting appendices. It does not transfer technical facts from the USEK example to Navoi State University.
1.2 Basis of evidence
1.3 Audit-style analytical boundaries and terminology
The review is structured in the sequence used in professional energy-audit reporting: definition of scope, description of energy infrastructure, evaluation of metered or reported energy flows, comparison of operating indicators, prioritisation of review areas, and identification of follow-up measures. This is an evidence-based institutional energy review rather than a claim of a completed on-site equipment survey.
Energy generated by a photovoltaic installation, electricity consumed within a university building, and electricity exported to the distribution network are distinct quantities. Accordingly, cumulative plant yield is interpreted as a lifetime production indicator, while the monthly university schedule is treated as a period-specific allocation record. Environmental equivalents shown by monitoring software are reported as calculated indicators rather than physical measurements of emissions or tree planting.
The starting point for the reporting period is July 2025, corresponding to the earliest supplied plant monitoring records. The latest supplied plant readings are from October 2026. The translated university electricity statement separately covers January–September 2026; these time frames should remain visible whenever the findings are cited.
The evidence consists of supplied July 2025 and October 2026 plant monitoring values, a wider multi-plant overview, and a signed Uzbek-language university electricity statement for 2026 with monthly values available through September. General monitoring features are described with reference to the Huawei FusionSolar documentation; university-specific data are drawn from supplied records.
2. Campus Energy Systems and Monitoring Infrastructure
The university’s photovoltaic assets support electricity generation for campus operations and grid export. The monitoring records cover faculty buildings and other university facilities. A portfolio overview displays nine plants and 2.02 GWh of aggregate cumulative generation with 430 kW of displayed inverter-rated power. These portfolio values represent the scope and reporting point of that overview and should not be equated automatically with a separate institutional capacity figure.
2.1 Selected installation inventory
Installation | Displayed capacity | Cumulative generation (Oct 2026) |
Foreign Languages Faculty | 50 kW | 285.28 MWh |
BTU | 50 kW | 277.33763 MWh |
Physics and Mathematics Faculty | 60 kW | 260.55 MWh |
Primary Education Faculty | 100 kW | 358.00 MWh |
Figure 1. Capacity distribution of four selected installations (260 kW in this subset; not the full university fleet).
2.2 Unified digital monitoring framework
2.3 Electrical energy supply and distribution review
The electricity pathway considered in this review begins with on-site photovoltaic generation and extends to the university’s internal electrical demand and the regional grid. In the monthly institutional schedule, electricity generated by solar panels is divided into the amount used for university requirements and the amount sold to the Navoiy regional electricity enterprise. This reporting structure makes the source document particularly useful for examining how renewable generation contributes to campus operations.
A detailed distribution-system audit would normally document main incoming supplies, transformer and switchboard arrangements, feeder allocations, metering locations and large end-use loads. Those engineering characteristics are not asserted here because the supplied evidence is primarily generation and allocation information. They form the logical next layer of a campus energy-review programme.
The monitoring environment adds operational context by providing plant-specific information that can be reviewed alongside the monthly institutional schedule. Plant records from different monitoring views are treated as a consolidated evidence set, with the individual scope and reporting period preserved.
The university’s plant records are presented in one consolidated analytical framework, allowing plant-level and portfolio-level information to be interpreted together. The FusionSolar environment supports plant overview, energy-yield statistics, operating indicators, energy-flow visualisation, environmental-benefit indicators and operational follow-up. Daily, monthly, annual and cumulative views can help staff recognise generation patterns and prioritise technical checks. Where consumption measurements are available, the same review framework can incorporate the relationship between on-site production, campus demand and grid exchange.
University monitoring reference: https://eu5.fusionsolar.huawei.com/unisso/login.action#/view/station/NE=134744099/overview
3. Electricity Generation and Allocation Analysis
3.1 Interpretation of the university electricity balance
The January–September 2026 schedule indicates that photovoltaic generation serves two functions: it contributes directly to university electricity requirements and it produces an amount sold to the regional network. Using the reported total row, approximately 45.1% of generation is allocated to internal needs and approximately 54.9% to grid sales. These are proportions of the reported solar generation, not proportions of the university’s total electricity demand.
Generation increases markedly from winter into the spring and summer months. The source reports 22.64 MWh in January, rising to 93.24 MWh in May, 99.46 MWh in June and 99.83 MWh in August, before 77.75 MWh in September. This progression offers a useful seasonal baseline for reviewing photovoltaic production in later years.
The electricity-allocation profile can inform decisions about when to run flexible daytime equipment. It does not, on its own, establish that export is an inefficiency: any change to operating schedules must be evaluated against teaching requirements, equipment constraints, grid arrangements and the university’s broader energy objectives.
The source university statement reports solar electricity generated and allocated between internal university requirements and the regional electricity enterprise. The recorded generation rises from approximately 22.64 MWh in January to 99.83 MWh in August before reaching 77.75 MWh in September. These values can form a seasonal reference series for future energy reviews.
Month | Generated (kWh) | University use (kWh) | Sold to grid (kWh) |
January | 22,637.72 | 8,013 | 14,625.0 |
February | 50,171.00 | 26,133 | 24,038.0 |
March | 76,430.00 | 30,873 | 45,557.2 |
April | 79,440.00 | 30,746 | 48,694.0 |
May | 93,238.00 | 36,075 | 57,163.0 |
June | 99,460.00 | 55,376 | 44,084.0 |
July | 95,786.00 | 42,115 | 53,671.0 |
August | 99,830.00 | 47,224 | 52,606.0 |
September | 77,750.00 | 36,686 | 41,064.0 |
SOURCE TOTAL | 694,742.72 | 313,241 | 381,502 |
Figure 2. Reported monthly generation and electricity allocation, January–September 2026.
Using the source-reported totals, approximately 45.1% of solar electricity is allocated to university use and 54.9% to grid sales. These figures are a useful starting point for examining the match between daytime campus demand and solar production. The source total is retained as printed rather than silently recalculated or replaced.
4. Comparative Plant Performance
Plant dashboards provide additional evidence of generation over time. The July 2025 records show the Foreign Languages Faculty with 8.94 MWh of monthly generation, 46.11 MWh year-to-date and 198.64 MWh cumulative output; BTU with 9.02 MWh monthly, 44.86 MWh year-to-date and 188.06 MWh cumulative output.
Plant | Cumulative generation (Oct 2026) | CO₂ avoided, platform estimate |
Foreign Languages Faculty | 285.28 MWh | 135.51 t |
BTU | 277.33763 MWh | Not provided in selected October comparison |
Physics and Mathematics Faculty | 260.55 MWh | 123.76 t |
Primary Education Faculty | 358.00 MWh | 170.05 t |
Figure 3. Reported cumulative generation for four selected plants; these values are not annual production totals.
The Primary Education Faculty has the highest displayed cumulative output among the selected records. A fair operational comparison requires the same observation interval and capacity-normalised indicators such as kWh per installed kW; lifetime cumulative figures alone are not a measure of relative plant efficiency.
The Foreign Languages Faculty record increased by 86.64 MWh between the two reporting points. This is the change in a lifetime cumulative total and is not described as annual generation.
Figure 4. Foreign Languages Faculty cumulative generation, July 2025 to October 2026.
4.1 Environmental benefit indicators
4.2 Monitoring indicators and comparative interpretation
Installed capacity describes the nominal size of an installation, while cumulative generation records the electricity produced over its recorded lifetime. A larger cumulative total may reflect greater installed capacity, longer service time or different operating conditions; therefore, it should not automatically be interpreted as superior efficiency.
The four selected plants provide a meaningful inventory for an initial comparative view: two installations of 50 kW, one of 60 kW and one of 100 kW. The sum of 260 kW belongs exclusively to this selected subset. For a formal performance comparison, each plant should be assessed over the same months using specific yield (kWh generated per kW installed), supported by information on site conditions and equipment availability.
For the Foreign Languages Faculty installation, the difference between the July 2025 and October 2026 cumulative readings is 86.64 MWh. The result illustrates the value of preserving historical platform records: cumulative readings taken at known review points can quantify intervening generation even when an annualised value is not appropriate.
Selected monitoring records include platform-calculated standard-coal savings, avoided CO₂ and tree equivalents. In October 2026 the Foreign Languages Faculty record displayed 114.11 tonnes of standard-coal savings, 135.51 tonnes of avoided CO₂ and 186 tree equivalents; Physics and Mathematics displayed 104.22 tonnes, 123.76 tonnes and 170 tree equivalents; Primary Education displayed 143.20 tonnes, 170.05 tonnes and 233 tree equivalents. These are modelled platform equivalents, not direct measurements of fuel consumed or trees planted.
5. Energy Review Methodology and Optimisation Priorities
5.1 Review of major end-use categories
The reference energy-audit structure distinguishes the electrical supply analysis from end-use load analysis. A university-specific review can follow the same logic by identifying major end-use categories and documenting their operating schedules, available meter readings and opportunities for control. This creates a route from general generation statistics to the practical question of where avoidable consumption may occur.
Lighting should be examined by building and operating period, including occupied teaching hours, corridor and exterior lighting, and controls for spaces with intermittent use. Cooling and ventilation should be examined through equipment inventories, temperature set points, maintenance records and operation during university breaks. Pumps and motors should be reviewed for duty cycles and scheduling. Computer rooms, laboratories and IT equipment warrant attention to standby loads and overnight operation.
The objective of these reviews is not to presume waste in a particular building. Rather, it is to compare measured consumption against building functions and operating needs, then prioritise locations where technical or behavioural measures offer a credible opportunity for reduction.
End-use category | Evidence to examine | Potential review focus |
Lighting | Fixture inventory; hours; controls | Scheduling, zoning and occupancy-based controls |
Cooling and ventilation | Equipment list; set points; runtime | Set-point management and operating schedules |
Pumps and motors | Motor ratings; duty cycles | Avoiding unnecessary runtime and matching demand |
IT and teaching equipment | Room inventory; after-hours demand | Shutdown practices and standby consumption |
Laboratories and workshops | Equipment loads; teaching timetable | Operational scheduling and load management |
Dormitories and common areas | Meter readings; occupancy profile | Base-load analysis and user engagement |
A recurring energy review should combine solar generation with consumption evidence for teaching buildings, laboratories, IT facilities, dormitories, pumps, lighting and heating or cooling equipment. Priority should be assigned using metered consumption, operating hours, building function and opportunities for controllable savings. The supplied data demonstrate monitoring of generation and allocation; building-by-building waste rankings require building consumption evidence.
Review component | Analytical method | Energy management value |
Solar plant performance | Monthly kWh and specific yield (kWh/kW) | Identify plants for detailed trend review |
Campus solar utilisation | Campus solar use / total solar generation | Evaluate direct use of renewable electricity |
Building electricity demand | Metered kWh by building and use type | Identify largest consuming facilities |
After-hours demand | Night/weekend electricity baseline | Locate potentially unnecessary continuous loads |
Equipment operating schedules | HVAC, pumps, IT and lighting time schedules | Find practical scheduling opportunities |
Action verification | Before/after measured energy use | Document achieved efficiency benefits |
6. Recommendations and Implementation Framework
6.1 Prioritisation, accountability and verification
Energy-efficiency measures are most effective when they are managed as a documented cycle rather than a one-off inspection. Each candidate measure should have an identified facility or system, a responsible unit, a baseline, a proposed intervention, an implementation date and a verification method. The review register can then distinguish opportunities under assessment from actions approved, implemented and verified.
For low-cost operational measures, the first priority can be to review controls, scheduling and equipment shutdown practices. Measures requiring capital expenditure should be considered through a technical and financial assessment that estimates electricity savings, implementation cost, operational implications and simple payback only where a reliable baseline is available.
The university can strengthen its annual evidence by linking monthly solar-generation reports with building-level demand summaries and records of completed efficiency actions. The resulting narrative would connect monitoring data to the identification of high-consumption areas and to measured improvements over time.
Review stage | Documentary output | Suggested responsible function |
Baseline and inventory | Meter register, asset list, consumption profile | Facilities / energy management |
Opportunity identification | Ranked energy-review findings | Technical services with building managers |
Measure assessment | Technical description and savings method | Facilities and finance |
Implementation | Approved action log and completion record | Responsible operating unit |
Verification | Before-and-after comparison and annual summary | Institutional energy-review team |
The following measures constitute a recommended review programme. They are presented as actions to undertake and document, not as unverified completed audits.
Monthly energy review register
Maintain a consistent register of installed capacity, monthly generation, cumulative yield, university use, grid export and review notes for each reporting period.
Building-level consumption prioritisation
Use electricity bills and available meters to rank buildings by kWh and normalise by floor area and operating hours where reliable inputs are available.
Targeted equipment inspections
Review high-demand laboratories, HVAC equipment, pumps, lighting and IT spaces, with attention to after-hours operation and controllable loads.
Solar-demand alignment
Review whether flexible daytime loads can be scheduled to coincide with solar production while preserving educational and operational requirements.
Verified action tracking
For each approved measure, record responsible staff, baseline, planned action, expected benefit, completion status and post-action measurement.
7. Conclusions
7.1 Institutional implications and next review cycle
The evidence demonstrates the value of an integrated review approach: plant-level monitoring explains the contribution of individual photovoltaic installations, while the institutional electricity statement describes the allocation of solar generation between university use and the regional network. Together, these records provide a quantitative starting point for a broader university energy-management process.
A mature recurring review would preserve the same reporting periods and definitions year after year, evaluate production and consumption in parallel, and record the outcome of technical inspections. It would also connect the monitoring process with the university’s energy-efficiency planning, so that recommendations can be translated into accountable actions and assessed against measurable baselines.
The reporting period for the present review is July 2025–October 2026. The monthly electricity statement covers January–September 2026 and remains reproduced in English as a separate appendix, ensuring that the original university source is accessible without conflating its scope with the plant-level monitoring record.
The university’s supplied records demonstrate substantial photovoltaic generation, documented allocation between campus use and grid export, and an established digital basis for reviewing individual plants. The January–September 2026 statement records 694,742.72 kWh generated, with 313,241 kWh used by the university and 381,502 kWh reported as sold to the regional grid. Selected plant dashboards provide further cumulative-generation and environmental-equivalent indicators. A systematic consumption review across buildings and equipment can build on this evidence to identify and prioritise the largest avoidable energy uses.
Appendix A. Source-Data Register
Evidence source | Scope | Reported figures |
Uzbek Languages Faculty electricity statement | Jan–Sep 2026 | 694,742.72 kWh generated; 313,241 kWh used; 381,502 kWh sold |
Foreign Languages Faculty monitoring | July 2025 | 198.64 MWh cumulative; 46.11 MWh year-to-date |
Foreign Languages Faculty monitoring | October 2026 | 285.28 MWh cumulative; 60.16 MWh year-to-date |
BTU monitoring | July 2025 / October 2026 | 188.06 MWh / 277.33763 MWh cumulative |
Physics and Mathematics monitoring | October 2026 | 260.55 MWh cumulative; 60 kW displayed capacity |
Primary Education monitoring | October 2026 | 358.00 MWh cumulative; 100 kW displayed capacity |
Multi-plant monitoring overview | October 2026 | Nine plants; 2.02 GWh aggregate cumulative yield; 430 kW inverter-rated power |
Separate previously supplied institutional context values are 510 kW photovoltaic capacity, 887,800 kWh renewable electricity generation and 750,525 kWh electricity consumption. These are retained as separately reported indicators because the reporting period and scope are not established as identical to the January–September electricity statement.
Appendix B. English Translation of the Uzbek Electricity Statement
Source heading (English translation): Information on electricity generated by solar panels installed at Navoi State University during January–December 2026, and its use for university needs, sale to the Navoiy regional electricity enterprise, and generation by solar thermal installations.
The original document contains monthly numerical entries for January–September 2026, followed by unfilled October–December rows. The solar thermal generation column contains no reported figures. The table below preserves the source headings and reported values.
No. | Month | Solar panels: generated electricity (kWh) | Used for university needs (kWh) | Sold to Navoiy regional electricity enterprise (kWh) | Solar thermal installations: generated electricity (kWh) |
1 | January | 22,637.72 | 8,013 | 14,625.0 | — |
2 | February | 50,171.00 | 26,133 | 24,038.0 | — |
3 | March | 76,430.00 | 30,873 | 45,557.2 | — |
4 | April | 79,440.00 | 30,746 | 48,694.0 | — |
5 | May | 93,238.00 | 36,075 | 57,163.0 | — |
6 | June | 99,460.00 | 55,376 | 44,084.0 | — |
7 | July | 95,786.00 | 42,115 | 53,671.0 | — |
8 | August | 99,830.00 | 47,224 | 52,606.0 | — |
9 | September | 77,750.00 | 36,686 | 41,064.0 | — |
10 | October | — | — | — | — |
11 | November | — | — | — | — |
12 | December | — | — | — | — |
TOTAL AS REPORTED | 694,742.72 | 313,241 | 381,502 | — |
Source note (English translation): Electricity sold to the Navoiy regional electricity enterprise in 2026. The original document bears handwritten annotations and signatures. Its figures and blank cells are preserved here without adding numerical assumptions.
Appendix C. Technical Platform Reference
C1. Practical use of the monitoring information for energy reviews
A photovoltaic monitoring environment is not merely a display of production totals. Its operational value lies in making a sequence of comparisons possible: plant output against its own earlier performance, generation across different reporting periods, production against rated capacity and, where corresponding consumption information is available, the relationship between solar supply and local demand.
Day-level views can support inspection of generation profiles and short-term changes. Monthly and yearly views can help establish seasonal baselines. Lifetime totals provide continuity across reporting periods, while portfolio summaries help staff maintain an overview of multiple campus installations. Environmental-benefit equivalents can communicate the wider significance of renewable electricity, provided they remain clearly identified as platform estimates.
For Navoi State University, the supplied plant records and university electricity schedule are brought together in one analytical report. This consolidated presentation supports decision-making without treating unlike measurements as interchangeable. It also provides a foundation for an evidence register that can be updated as further monthly, building-level and equipment-level information becomes available.
The Huawei FusionSolar monitoring environment is designed to support the management and analysis of photovoltaic installations. Its general functions include plant overviews, energy yield and consumption statistics, energy-flow representations, alarm information, operating indicators and environmental benefit estimates. For a university, these functions can support plant-to-plant comparisons, month-by-month trend analysis, operational follow-up and consistent reporting across facilities.
The university’s monitoring information is presented throughout this report as one consolidated analytical picture. This does not require assuming that every displayed source or historical record was collected through the same technical account or configuration. The source records remain identifiable by plant, reporting date and measurement type.
University monitoring page: https://eu5.fusionsolar.huawei.com/unisso/login.action#/view/station/NE=134744099/overview
References
Navoi State University. Electricity generation and allocation statement, 2026 (original Uzbek document supplied).
2. Navoi State University. Photovoltaic monitoring records for selected installations, 2025–2026 (supplied).
3. Energy Efficiency Group. Energy Audit Report for USEK, February 2015 (sample supplied; structure reference only).
4. Huawei Digital Power. FusionSolar documentation and plant monitoring guidance (general technical reference).
5. https://eu5.fusionsolar.huawei.com/unisso/login.action#/view/station/NE=134744099/overview