NAVOI STATE UNIVERSITY
INSTITUTIONAL POLICY FRAMEWORK
ENERGY EFFICIENCY POLICY FOR NEW
BUILDINGS AND RENOVATIONS
Originally adopted in 2019
Reviewed annually | Most recent review in 2026
Navoiy, Uzbekistan | 2026
Document control
Field | Details |
INSTITUTION | Navoi State University |
DOCUMENT | Energy Efficiency Policy for New Buildings and Renovations |
ORIGINAL ADOPTION | 2019 |
REVIEW CYCLE | Annual |
MOST RECENT REVIEW | 2026 |
RESPONSIBLE OFFICIAL | Allayev Khurshid, Head of Sustainability Development Department |
1. Policy Statement and Scope
Navoi State University requires every new construction and renovation project under its control to comply with the applicable energy efficiency standards of the Republic of Uzbekistan. This requirement applies regardless of funding source and extends to University-managed projects delivered by external designers and contractors.
The policy covers academic buildings, laboratories, libraries, administrative and sports facilities, student residences and associated building services. Renovation includes reconstruction, refurbishment and replacement of building elements or fixed services. For limited-scope works, the University records which requirements apply to the elements or systems affected.
2. Applicable Building Standards
The project designer identifies the applicable editions and clauses for the building type, use and scope of works. The University records those requirements and any applicable transitional provisions in the project file before authorising procurement.
QMQ 2.01.04-2018 Building Thermal Engineering. Apply the applicable thermal requirements to the building envelope. Apply successor SHNQ 2.01.04-25 from its legal effective date, in accordance with applicable transitional provisions. See Order No. 01/2-34 and Annex 2. Lex.uz
SHNQ 2.01.18-24 Energy Consumption Standards for Heating, Ventilation and Air Conditioning of Buildings and Structures. Record the applicable calculation method and demonstrate compliance with the relevant energy consumption criteria. Lex.uz
SHNQ 2.01.05-24 Natural and Artificial Lighting. Verify that lighting design meets the applicable daylight and artificial lighting requirements. Lex.uz
SHNQ 2.08.06-23 Design Requirements for Educational Organisations. Apply the requirements relevant to educational facilities within the project scope. Lex.uz
3. Legislative Basis
Law No. O‘RQ-940 of 7 August 2024 Article 25 provides the statutory framework for energy savings and energy efficiency in construction. Lex.uz
Presidential Resolution No. PQ-100 of 11 March 2025 Paragraph 11 applies from 1 June 2025. For new construction and reconstruction requiring technical conditions, project documentation must provide for energy-saving equipment, alternative heating systems and renewable energy installations for on-site use. The design addresses roof and façade insulation as applicable to the project and the permitting requirements. Lex.uz
Law No. O‘RQ-539 of 21 May 2019 Articles 21 and 22 govern technical regulation, conformity assessment and requirements relevant to the use of renewable energy sources. Lex.uz
Energy Efficiency Requirements
4.1. Building envelope. All new university buildings must meet the applicable national thermal performance requirements. Where a renovation affects roofs, external walls, floors, windows or doors, the renovated elements must meet the requirements applicable to that work. The project documentation must specify the required thermal performance, and the University verifies that the installed materials and components meet the approved design.
4.2. Heating, ventilation and air conditioning. New and replacement systems must comply with SHNQ 2.01.18-24 where applicable. The designer must demonstrate compliance in the project calculations. For renovations, the designer assesses the existing systems affected by the work and documents the basis for selecting replacement equipment and controls.
4.3. Lighting. New and renovated lighting installations must meet the applicable requirements of SHNQ 2.01.05-24. The University requires energy-efficient lighting and controls suited to the use of each space. Lighting levels must be verified before the affected spaces are accepted for use.
4.4. Renewable energy and metering. Where paragraph 11 of Presidential Resolution No. PQ-100 applies, the University requires the project design to provide for energy-saving equipment, alternative heating systems and renewable energy installations for on-site use. The design must also identify any electricity and heat metering required for the project.
Compliance Verification and Acceptance
5.1. Design and procurement. Before issuing a tender, the University verifies that the project documentation identifies the applicable energy efficiency standards and demonstrates how the design meets them. The approved performance requirements are incorporated into the tender and contract documents.
5.2. Construction and renovation. The personnel responsible for technical supervision check that installed materials, equipment and systems meet the approved design. Insulation and other work that will be concealed must be inspected before it is covered. Any proposed substitution must be checked against the approved performance requirements before installation.
5.3. Acceptance of works. The University accepts the affected works only after the required inspections and commissioning tests have been completed and documented. Any failure to meet an applicable energy efficiency requirement must be corrected and the correction verified before acceptance.
Responsibilities and Annual Review
6.1. Implementation. The University personnel responsible for facilities and construction maintain the compliance records for each project, including design calculations, inspection reports and commissioning results. Procurement personnel include the approved energy efficiency requirements in tender and contract documents.
6.2. Annual review. The Head of Sustainability Development Department coordinates the annual review of this policy. The review considers changes to national standards, compliance findings from completed projects and any corrective actions required.
6.3. Adoption and review record. The University adopted this policy in 2019 and reviews it annually. The most recent review took place in 2026.
Allayev Khurshid
Head of Sustainability Development Department
NAVOI STATE UNIVERSITY
INSTITUTIONAL POLICY FRAMEWORK
POLICY ON DIVESTMENT FROM
CARBON-INTENSIVE ENERGY INDUSTRIES
Originally adopted in 2021
Reviewed annually | Most recent review in 2026
Navoiy, Uzbekistan | 2026
Document control
Field | Details |
INSTITUTION | Navoi State University |
DOCUMENT | Policy on Divestment from Carbon-Intensive Energy Industries |
ORIGINAL ADOPTION | 2021 |
REVIEW CYCLE | Annual |
MOST RECENT REVIEW | 2026 |
RESPONSIBLE OFFICIAL | Allayev Khurshid, Head of Sustainability Development Department |
1. Policy Statement and Scope
Navoi State University prohibits new investments in carbon-intensive energy industries and requires the disposal of existing holdings. Coal and oil are the first priorities for divestment. These requirements apply to all assets over which the University has investment authority, including funds held directly, separately managed accounts and pooled investments. Endowment and retirement assets are covered where the University controls their investment.
Covered activities include coal mining and processing, oil and gas exploration and extraction, petroleum refining, fossil fuel transport or distribution, and electricity generation primarily from fossil fuels. An issuer is covered where these activities constitute a principal line of business, as evidenced by its financial disclosures, business segments or operating assets. The same assessment applies to a parent issuer where covered activities are conducted through controlled subsidiaries.
2. Restrictions on New Investments
Direct and separately managed holdings. The University must not purchase or increase a covered holding in shares, debt or other instruments that create investment exposure. The restriction applies to reinvestments and rollover transactions. Investment mandates must communicate the exclusion to external managers before appointment or renewal.
Pooled funds. Before committing funds or renewing a mandate, the University must obtain sufficient information about underlying exposure and the manager’s exclusion rules. A new or renewed commitment requires documented compliance with the exclusion. Where existing exposure cannot be established, the University records it as unverified and suspends additional discretionary commitments until it obtains sufficient evidence or exits the investment.
Pre-investment approval. Finance personnel document the screen and its source before authorising a transaction. If information is incomplete or sources conflict, the transaction remains on hold while the Investment Committee determines whether the issuer or fund is eligible.
3. Disposal of Existing Investments
Coal. The University initiates divestment as soon as it identifies an existing covered coal holding. A liquid direct holding must be sold at the first lawful and practicable opportunity. Where a pooled fund or contract prevents immediate exit, the University requests removal of the exposure or gives notice for the earliest permitted redemption or transfer.
Oil. The University phases out covered oil holdings after prioritising coal for disposal. The Investment Committee assigns an exit route, milestones and a target completion date to each holding. Where immediate sale is practicable, the University proceeds without waiting for the next portfolio review. Remaining covered fossil fuel holdings follow the same process.
Execution and follow-up. Finance personnel record the applicable dealing window, notice period and disposal evidence. Missed milestones are reported to the Investment Committee, which records the reason, corrective action and revised deadline. Any holding retained beyond its scheduled exit requires a documented temporary exception under Section 4.
4. Temporary Exceptions
An exception applies only to an existing position where a legal, contractual or market constraint prevents disposal at the required time. The Investment Committee records the specific constraint, the supporting evidence, the responsible officer, the expiry date and the earliest feasible exit. Approval of an exception does not authorise a new purchase or an increase in exposure.
Finance personnel review each exception at the next available disposal window and at least annually. Renewal requires a new written decision supported by current evidence. The exception ends when the constraint lifts or the approval expires.
5. Records, Oversight and Disclosure
Finance personnel maintain a divestment register. For each identified holding, the register records the issuer or fund, sector, direct or indirect exposure, value where available, source of verification, decision, responsible officer, deadline and evidence of completion. An outstanding information request or a blocked exit remains open until it is resolved.
The Investment Committee reviews the full portfolio at least annually, including any mandates managed by third parties. It submits an annual report to the University’s governing body showing opening and closing exposure by sector, disposals completed, remaining positions, unverified exposure, overdue actions and approved exceptions. Where the review finds no covered holdings, the report records that result and the scope of the review.
The University makes the policy and an annual summary of progress available to its community. The summary reports the outcome of the review and the remaining actions while protecting information subject to confidentiality obligations. The University considers feedback from students, staff and alumni during policy review.
6. Reinvestment and Annual Policy Review
The University considers renewable energy, energy efficiency and other low-carbon opportunities when reinvesting proceeds. Proposed reinvestments remain subject to the exclusion and the University’s investment requirements for risk, liquidity and suitability.
The Head of Sustainability Development Department coordinates the annual review with the Investment Committee. The review considers screening results, progress against exit milestones, disclosure gaps and the effectiveness of approved exceptions. The policy was originally adopted in 2021, is reviewed annually and was most recently reviewed in 2026.
Allayev Khurshid
Head of Sustainability Development Department